Delivery · Made to order in Nanjing

Installation day: what actually happens

A 500 kg rack does not arrive by courier and get assembled by one person. Here is the real sequence, so you know what to expect and what to prepare.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

1 · The delivery window is confirmed, not guessed

Two to three days before the truck leaves we call to confirm the address, the floor, whether there is a lift, and whether the stairwell turns are wide enough for a 2.34 m package. If the stairwell is the only way up, we tell you the extra cost up front instead of discovering it on the day.

2 · The frame comes up in parts

The machine is packed as uprights, cross members, the weight stack and the pulley blocks. That is what makes a 500 kg machine fit a normal building. If you are on a high floor without a lift, plan for a stair carry — it is priced separately and we quote it before payment.

3 · Assembly is one person, three to four hours

Uprights are levelled, the frame is squared against the wall, the weight stack is loaded and the pulleys are routed. Nothing is left for you to tighten later — the last step is a full load test on every station.

4 · We test it with you, not for you

Cable travel, Smith bar glide, safety catches and every attachment point get checked in front of you. If you want the leg curl pad or the Z beam added later, it is a bolt-on, not a rebuild.

5 · Floor and wall protection

Rubber matting under the frame, and a check that nothing leans on a plasterboard wall. In a flat, the frame sits on the floor plate rather than against the wall, which is why the footprint drawing matters more than the wall length.

What to prepare before we arrive

Questions people ask

Is assembly included in the price?

It is a separate service, priced at ¥800 for city delivery. On the full bundle it is already inside the bundle price.

Can I assemble it myself?

Yes. Many customers do. It takes two people and about a day, and we send the sequence with the crate.

What if my lift is too small?

The uprights are the longest part. If they do not fit the lift we carry them up the stairs and quote that separately before you pay.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

Related: Will it fit your room? · MT-4002K · Bundles