Delivery day: crate, lift, stairwell and what to check before you sign

Installation is one thing; getting a 500 kg machine to your door is another. Here is the part that happens before anyone opens a toolbox.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

When the truck leaves

Production finishes, the machine is packed into a timber crate, and we confirm the delivery address and window two to three days before it leaves Nanjing. Delivery is included within mainland China; the window is set with the carrier, not around it.

The crate is the real constraint

The uprights are the longest single part. If they fit in your lift, delivery is simple. If they do not, the machine goes up the stairwell — and that is a priced service, quoted before you pay, not discovered at the door.

What to check before signing

Where the crate goes afterwards

Plan for it. A crated machine takes the floor space of a small car. Most customers keep it for the installation day and then break it down for recycling or storage.

Timing, honestly

Standard configuration is about 60 days from deposit, custom work up to 90. Transit adds time depending on the province. We give the carrier window, not a promise of a specific hour.

Questions people ask

Can it be delivered to a warehouse instead?

Yes. Give us the address and the receiving contact.

What if my building bans large deliveries?

Tell us before the truck leaves. Booking a stair carry or an after-hours slot is easier than arguing at the gate.

Is the crate waterproof?

It is timber with a liner, fine for normal transit, not for standing in the rain for a week.