Delivery day: crate, lift, stairwell and what to check before you sign
Installation is one thing; getting a 500 kg machine to your door is another. Here is the part that happens before anyone opens a toolbox.
When the truck leaves
Production finishes, the machine is packed into a timber crate, and we confirm the delivery address and window two to three days before it leaves Nanjing. Delivery is included within mainland China; the window is set with the carrier, not around it.
The crate is the real constraint
The uprights are the longest single part. If they fit in your lift, delivery is simple. If they do not, the machine goes up the stairwell — and that is a priced service, quoted before you pay, not discovered at the door.
What to check before signing
- Crate condition. Note any crushed corner or water damage on the delivery sheet before you sign.
- Count the parts against the packing list. Uprights, cross members, weight stack, pulley blocks, hardware box, accessories.
- Photograph the damage if there is any. Photos taken after the carrier leaves are harder to claim on.
- Do not unbolt the crate until the room is ready. It is the cheapest protection you get.
Where the crate goes afterwards
Plan for it. A crated machine takes the floor space of a small car. Most customers keep it for the installation day and then break it down for recycling or storage.
Timing, honestly
Standard configuration is about 60 days from deposit, custom work up to 90. Transit adds time depending on the province. We give the carrier window, not a promise of a specific hour.
Questions people ask
Can it be delivered to a warehouse instead?
Yes. Give us the address and the receiving contact.
What if my building bans large deliveries?
Tell us before the truck leaves. Booking a stair carry or an after-hours slot is easier than arguing at the gate.
Is the crate waterproof?
It is timber with a liner, fine for normal transit, not for standing in the rain for a week.