Deposit, production and the 60–90 day window

The machine is not in a warehouse waiting. It is built after you order it. That is why the timeline looks long, and why the first two weeks matter most.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

What happens after you pay the deposit

Day 0 · Configuration is locked

Model, colour, attachments, delivery address and floor. We confirm them in writing, because these are the things that cannot change later without cost.

Day 1–14 · The change window

This is the only comfortable moment to add a pegboard, change a model or swap a plate set. After cutting starts, an addition is a separate order.

Day 15–75 · Production

Frames, pulleys, weight stacks and upholstery are made and assembled in Nanjing. 60–90 days is the honest range: 60 on a standard configuration, longer on a colour or a size that has to be made for you.

Before shipping · Balance

The remaining payment is settled before the machine leaves. Then the delivery window is booked and assembly is scheduled with it.

Why not "in stock, ship tomorrow"

Because a rack that fits one room does not fit the next. Made to order is what lets you choose the colour, the width, the attachments and the base plate. The cost is time; the benefit is that nothing is a compromise.

Questions people ask

Can I pay the whole thing at once?

Yes, and some customers do. The deposit exists to start production, not to split the risk.

Can I change the delivery date?

Yes, up to a week before the truck leaves, at no cost.

What if it arrives damaged?

We inspect the crate with you on delivery. Anything broken in transit is replaced, not repaired.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

Related: Price list · Bundles · Build a quote