Training · Made to order in Nanjing

The first month on a new machine: a plan that does not need a coach

Most people buy the machine and then stand in front of it. Here is a four-week progression that uses the stations you actually have.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

Week 1 — learn the stations, not the load

Two sessions. Cable press, cable row, pulldown, Smith squat with an empty bar. Two sets of eight each, light enough to talk through. The goal is the adjustment, not the weight: seat height, pulley height, pin position.

Week 2 — add one compound per session

Smith bench and Smith row join the rotation. Keep the loads at a level where the last rep is slow but the form does not change. Three sets of eight.

Week 3 — split upper and lower

Upper day: cable press, row, pulldown, lateral raise on the low pulley. Lower day: Smith squat, Romanian deadlift with the bar, leg curl on the pad, calf raise. This is where the machine starts earning its footprint.

Week 4 — test, then repeat

Pick three lifts and find a load you can do eight good reps with. That becomes your baseline. Do not test more than three — testing is not training.

The three mistakes

Questions people ask

How often?

Two to three sessions a week is enough to progress at home.

Do I need a bench?

For pressing and rows, yes. It is not in the crate unless you add it.

Can two people share it?

Yes — that is what the 4102K's independent pulleys are for.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

Related: MT-4002K · Room layout · Build a quote