Ownership · Made to order in Nanjing

Moving house with the machine: what comes apart and what does not

A machine you cannot move is furniture. The 4002K and 4102K come apart into uprights, cross members, stack and pulley blocks — here is how to do it without re-levelling from scratch.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

What comes apart

The order that matters

Photograph the cable routing before you touch it. Every other part is a bolt; the cable path is the one thing that is hard to reconstruct from memory. Then: plates out, cables off, cross members off, uprights last.

What you lose in a move

Levelling. A frame that was squared to one wall will not be square to the next. Budget half a day to re-level and re-tension after reassembly — or book the assembly service at the new address.

What survives

The frame, the stack and the pulley blocks. Steel does not care about a move. Wear items are cables and pulleys, and those are replaceable parts, not a new machine.

One honest caution

If you move into a flat on a high floor without a lift, the stair carry is the same cost problem as the first delivery. Ask before you sign the lease, not after.

Questions people ask

Can two people move it?

Dismantled, yes — uprights are the heavy part.

Do you offer a relocation service?

Within Nanjing, ask. Long distance, we can send the dismantling sequence.

Will it need new bolts?

No, but keep the hardware box. Losing it is the usual problem.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

Related: Installation day · Delivery day · MT-4002K