Buying · Made to order in Nanjing

Six things to confirm before you pay a deposit

Everything here costs nothing to check and one of them, missed, costs a rebuild after delivery.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

1. The exact model code

MT-4002K and MT-4112K are both three-in-one frames and are not the same machine. Write the code in the message, not "the middle one".

2. The accessory list, item by item

Accessories are separate lines on the price sheet — pegboard 260, plate peg 228, roller hooks 400, leg curl pad 160. Confirm the list in writing so nothing arrives missing and nothing arrives you did not want.

3. The route into the room

Door width, lift depth, stair landing, corridor corners. The frame arrives assembled in sections; if a section will not turn the landing, that is discovered at the door.

4. Ceiling height above the machine

2.34 m for the MT-4002K. Measure the lowest obstruction — light, duct, door track — directly above where the frame will stand.

5. What is under the floor

A concrete slab handles roughly 500 kg of machine plus two people. Suspended timber does not, and no mat changes that. If you rent, this is a question for the landlord or building manager.

6. Delivery address type and who receives it

Ground floor, lift building, or walk-up with a stair carry — each is a different job. Assembly is a separate service at 800 and priced as indoor assembly, not as carrying the pallet upstairs.

Questions people ask

Can I change the configuration after paying?

Ask before paying. Anything agreed after production starts is a change to a build in progress.

Do I need assembly?

If you are comfortable with a socket set and two people are available, no. If not, price it in from the start.

What if the machine does not fit?

That is why the first five items exist. Check them before the deposit, not after delivery.

Not sure which one fits your room? Build the configuration and we check space, floor loading and lead time.
Build a quote in 60 secondsEmail us

Related: Ordering and lead time · Bundles · First-gym mistakes · Build a quote